# SDR CA100618002

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 17, 2010
- Submitted: January 4, 2011
- Operation: Air carrier
- Make and model: Piper PA60600
- Aircraft time: 5,215 hours
- Engine: Lyc IO540K1J5
- Propeller: Hartzl HCC3YR2
- System (JASC): [2822 · Fuel Boost Pump](https://openairdocs.org/jasc/2822)
- Part: Pump
- Part number: 2B66
- Condition: Malfunctioned
- Location: Nr 2 Fuel Boost
- Stage of operation: TX
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA100618002

## Discrepancy

NR2 BOOST PUMP POPPING CIRCUIT BREAKER.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
