# SDR CA100728003

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 21, 2010
- Submitted: January 4, 2011
- Operation: Air carrier
- Make and model: Emb ERJ170200SU
- Aircraft time: 10,189 hours
- Engine: Ge CF348E5A1
- System (JASC): [5497 · Nacelle/Pylon System Wiring](https://openairdocs.org/jasc/5497)
- Part: Wire Harness
- Part number: 17101017401
- Condition: Burned
- Location: Rt Pylon
- Part time: 11,647 hours
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA100728003

## Discrepancy

WHILE PERFORMING J/C Z419-001ACR-U "DURING THE INSP, PAY PARTICULAR ATTENTION TO HOT AIR LEAKS FROM THE PRE-COOLER ON ELECTRICAL CABLES" --WIRING HARNESS W607 AND CLAMPS IN RT PYLON ARE HEAT DAMAGED FROM HOT AIR LEAKAGE AT PRECOOLER.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
