# SDR CA120516003

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 11, 2012
- Submitted: September 14, 2015
- Operation: General aviation
- Make and model: Bombdr BD7001A10
- Aircraft time: 1 hours
- Engine: Rroyce BR700710A220
- System (JASC): [2897 · Fuel System Wiring](https://openairdocs.org/jasc/2897)
- Part: Wire
- Condition: Damaged
- Location: Lt Wing Tank
- Part time: 4,588 hours
- Stage of operation: NR
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA120516003

## Discrepancy

(CAN) REPLACED WIRES LEADING TO DENSITOMETER IN LT WING TANK IAW GUIDELINES OF SRPSA 42163 AND MITSUBISHI HARNESS DWG GM598-2510-101, REV "C".

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
