# SDR CA980519021

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 3, 1998
- Submitted: March 26, 2000
- Operation: General aviation
- Make and model: Beech 200BEECH
- Engine: Pwa PT6A41
- System (JASC): [2810 · Fuel Storage](https://openairdocs.org/jasc/2810)
- Part: Valve
- Part number: 10138901131
- Condition: Failed
- Location: Fuel System
- Component: 993800007
- Stage of operation: IN
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CA980519021

## Discrepancy

(CAN) NACELLE FUEL CELL OVERPRESSURIZED DUE TO FAILURE OF CHECK VALVE CAUSING STRUCTURAL DAMAGE TO THE WHEEL WELL.  CHECK VALVE REPLACED AND A/C FLOWN FOR 60 HOURS WITH NO SIGNS OF FURTHER DAMAGE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
