# SDR CALA2018092801994

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: September 24, 2018
- Submitted: September 28, 2018
- Operation: Air carrier
- Aircraft: N415UA
- Make and model: Airbus A320-232
- Registry model: [Airbus A320-232](https://openairdocs.org/model/airbus-a320-232) (OpenAirDocs)
- Aircraft serial: 475
- Aircraft time: 77,944 hours, 30,349 cycles
- System (JASC): [5311 · Fuselage Main, Frame](https://openairdocs.org/jasc/5311)
- Part: Frame
- Part number: D5311275120200
- Condition: Cracked
- Location: Frm 16
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CALA2018092801994

## Discrepancy

DURING CURRENT HMV4 CHECK AT ARR-ASD, WHILE ACCOMPLISHING INSPEC TION IAW ALI 53-11-03, A CRACK WAS DISCOVERED IN THE INTERCOSTAL & FRAME LAYERS AT LWR I/B FASTENER HOLE OF FR16 L1 DOOR STOP FIT TING #1 (HOLE #3 AS PER AIRBUS REPAIR DRAWING R531-12118, ISSUE D). REPAIRED L1 PASSENGER DOOR CUTOUT STOP FITTING #1 AT FR16 IAW ECRA 5311-02007. ACCOMPLISH THE INITIAL INSPECTION REQUIREMENTS PER PART 2 OF ECRA 5311-02007 ON OR BEFORE THE AIRCRAFT REACHES ADD EMP:U355101 44649 TOTAL AIRCRAFT FLIGHT CYCLES. ACCOMPLISH THE REPEAT INSPEC TIONS AT INTERVALS NOT TO EXCEED 14300AIRCRAFT FLIGHT CYCLES THE REAFTER.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
