# SDR CALA2019071401190

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 29, 2019
- Submitted: July 14, 2019
- Operation: Air carrier
- Aircraft: [N13248](https://openairdocs.org/aircraft/N13248), registered now
- Make and model: Boeing 737824
- Aircraft serial: 28808
- Aircraft time: 62,832 hours, 22,675 cycles
- System (JASC): [5312 · Fuselage Main, Bulkhead](https://openairdocs.org/jasc/5312)
- Part: Pressure Deck
- Part number: 11A1111
- Condition: Cracked
- Location: Rt Mlg Ww
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CALA2019071401190

## Discrepancy

CRACK INDICATION FOUND AT CENTRE WING BOX REAR SPAR VIRTICAL PRESSURE DECK ONE CRACK BETWEEN RBL 31-83 TO 40.0 AND ANOTHER CRACK BETWEEN RBL 40.0 TO 45.64.BETWEEN WL 200.6 & WL 192.0, 2 CRACKS EACH AS MARKED IN RED. ACCOMPLISHED CATEGORY B REPAIR AT CENTER WING REAR SPAR VERTICAL PRESSURE DECK BETWEEN RBL 31.82 TP 40.0 AND RBL 40.0 TO 45.64 BETWEEN 200.6 & WL 192.0 AS PER SRM 57-10-10 REPAIR 3 ALTERNATIVE 2 FIG 204 AND TABLE 202. THIS REPAIR REQUIRES SUPPLEMENTAL INSPECTIONS AS GIVEN IN TABLE 204 SRM 57-10-10 REPAIR 3 PAGE 211-212 INITIATE DIP TO ACP HFEC INSPECTION OF THE REPAIR AT AN INTERVAL OF 36,000 CYC AND AN INSPECTION THRESHOLD OF 56,000 CYC REF SRM 57-10-10 REPAIR 3 PAGE 211 & 213. TOMC APPROVED DIP INITIAL INSPECTION AT 56,000 FLT CYCLES AFTER REPAIR INSTALLATION FOR

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
