# SDR CALA2025122412397

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: December 21, 2025
- Submitted: December 24, 2025
- Operation: Air carrier
- Aircraft: [N17753](https://openairdocs.org/aircraft/N17753), registered now
- Make and model: Boeing 737724
- Aircraft serial: 30463
- Aircraft time: 70,324 hours, 27,487 cycles
- System (JASC): [3030 · Pitot/Static Anti-Ice System](https://openairdocs.org/jasc/3030)
- Part: Pitot Tube
- Part number: 0851HT1
- Part serial: 406751
- Condition: Faulted
- Location: Zone 100
- Part time: 11,554 hours, 4,612 cycles
- Stage of operation: CR
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CALA2025122412397

## Discrepancy

CAPT PITOT LIGHT ON,  LIGHT WITH ASSOCIATED TRIPPED C/B.   REMOVED AND REPLACED CAPT PITOT PROBE IAW AMM 34-11-01. OPS CHECKED GOOD. BREAKER REMAINS IN. REFER TO LOG 7349998 FOR LT PITOT SYSTEM LEAK TEST IAW AMM 34-11-00-790-810.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
