# SDR CALA2026033014916

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: March 26, 2026
- Submitted: March 30, 2026
- Operation: Air carrier
- Aircraft: [N35204](https://openairdocs.org/aircraft/N35204), registered now
- Make and model: Boeing 737824
- Aircraft serial: 30576
- Aircraft time: 78,032 hours, 29,124 cycles
- System (JASC): [3411 · Pitot/Static System](https://openairdocs.org/jasc/3411)
- Part: Pitot Tube
- Part number: 0851HT1
- Part serial: 423782
- Condition: Faulted
- Location: Zone 200
- Part time: 10,669 hours, 4,869 cycles
- Stage of operation: CL
- How discovered: O
- Nature of condition: O
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/CALA2026033014916

## Discrepancy

FEEL DIFF PRESS LIGHT ON  AFTER TAKEOFF FULL NOSE UP TRIM FOR LA NDING REF FIM 27-31 TASK 815.  FLUSHED OUT R/H ELEV PITOT. NO CLOGS NOTED. L/H PITOT HAS OBSTRUCTION. REMOVED ELEVATOR PITOT PROBE REF AMM 27-31-94-000-801. CONDUCTED ELEVATOR PITOT STATIC FLUSHING REF AMM 27-31-17-170-801. CLOG IDENTIFIED IN PITOT PROBE. INSTALLED NEW SERVICEABLE LT (AUX) ELEVATOR PITOT PROBE REF AMM 27-31-94-400-801. LEAK CHECK'S AND OP'S CHECKS PASSED WITH NO FAULTS.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
