# SDR DALA2021110206754

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: October 28, 2021
- Submitted: November 2, 2021
- Operation: Air carrier
- Aircraft: [N110DU](https://openairdocs.org/aircraft/N110DU), registered now
- Make and model: Bombdr BD1001A10
- Aircraft serial: 50029
- Aircraft time: 6,109 hours, 2,808 cycles
- System (JASC): [5330 · Fuselage Main, Plate/Skin](https://openairdocs.org/jasc/5330)
- Part: None
- Condition: None
- Stage of operation: IN
- How discovered: O
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/DALA2021110206754

## Discrepancy

A220-100 / FUSELAGE / NOSE FWD FUSELAGE / BL5.76R FWD OF FR10 / DENT. REPAIR APPROVAL IS LIMITED TO 30,000FC/52,500FH, (WHICHEVER OCCURS FIRST) FROM SECTION I REPAIR. ADDITIONAL ENGINEERING AUTHORIZATION IS REQUIRED FOR CONTINUED SERVICE BEYOND THIS LIMIT. NOTE TO ENGINEER: THIRD STAGE APPROVAL IS REQUIRED PRIOR TO INSPECTION THRESHOLD IN ACCORDANCE WITH PROCEDURES ESTABLISHED IN FAA AC 120-93. MONITOR,A220-100 / FUSELAGE / NOSE FWD FUSELAGE REFERENCE 14-588339. (LP# 1999214)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
