# SDR DL75E081691

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: December 3, 2008
- Submitted: December 10, 2008
- Operation: Air carrier
- Aircraft: [N706TW](https://openairdocs.org/aircraft/N706TW), registered now
- Make and model: Boeing 757-2Q8
- Registry model: [Boeing 757-2Q8](https://openairdocs.org/model/boeing-757-2q8) (OpenAirDocs)
- Aircraft serial: 28165
- Aircraft time: 39,876 hours, 13,422 cycles
- Engine: Pwa PW2037
- System (JASC): [3097 · Ice/Rain Protection System Wiring](https://openairdocs.org/jasc/3097)
- Part: Terminal
- Condition: Melted
- Location: Window
- Component: Window
- Component part number: 141T480150
- Stage of operation: CR
- How discovered: O
- Nature of condition: B
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/DL75E081691

## Discrepancy

FLT CREW REPORTED SMOKE AND FUMES IN THE FLT DECK.  DAL MTC DETERMINED R1 WINDOW HEAT TERMINAL MELTED.  CONFIRMED SMELL.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
