# SDR DLM88030678

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 20, 2003
- Submitted: August 4, 2003
- Operation: Air carrier
- Aircraft: N908DL
- Make and model: Doug MD-88
- Registry model: [Doug MD-88](https://openairdocs.org/model/mcdonnell-douglas-md-88) (OpenAirDocs)
- Aircraft serial: 49539
- Aircraft time: 44,351 hours, 36,619 cycles
- Engine: Pwa JT8D219
- Engine time: 35,101 hours, 28,369 cycles
- System (JASC): [2910 · Hydraulic System, Main](https://openairdocs.org/jasc/2910)
- Part: Line
- Part number: AE7055381
- Condition: Chafed
- Location: Nr 1 Engine
- Stage of operation: CL
- How discovered: O
- Nature of condition: K, J
- Precautionary procedure: L
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/DLM88030678

## Discrepancy

DURING CLIMBOUT PASSING FL250. THE LT HYD PRESS LOW MSG ILLUMINATED ON OAP. LT HYD QTY DROPPED TO 3 QTS,  ACCOMPLIHED POM PROCEDURE FOR HYD PRESS LOW,HYD QTY LOW OR DECREASING AND FINALLY LT HYD SYS FAILURE. PRIOR TO ENG START THE HYD QTY READ L-16..RT-14.  FOUND LT ENG CENTER HYD FLEX LINE FROM PYLON TO ENG BADREPLACED HYD LINE LEAK CHECKS GOOD

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
