# SDR DLM90970319

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: February 20, 1997
- Submitted: March 26, 2000
- Operation: Air carrier
- Aircraft: N910DN
- Make and model: Doug MD-90-30
- Registry model: [Doug MD-90-30](https://openairdocs.org/model/mcdonnell-douglas-md-90-30) (OpenAirDocs)
- Aircraft serial: 53390
- System (JASC): [2420 · AC Generation System](https://openairdocs.org/jasc/2420)
- Part: Relay Socket
- Condition: Failed
- Location: Nr 2 Engine
- Part time: 4,118 hours
- Stage of operation: CL
- Nature of condition: H, J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/DLM90970319

## Discrepancy

AIR TURNBACK, RT GEN FAIL IAW POM.   APU START WAS ATTEMPED APU WOULD NOT START AFTER SEVERAL TRYS.  REPLACED RGR POWER RELAY SOCKET, OPS GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
