# SDR DXTA200702151

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: April 27, 2007
- Submitted: April 28, 2007
- Operation: Air carrier
- Aircraft: [N939QS](https://openairdocs.org/aircraft/N939QS), registered now
- Make and model: Cessna 750
- Registry model: [Cessna 750](https://openairdocs.org/model/cessna-750) (OpenAirDocs)
- Aircraft serial: 7500193
- Aircraft time: 5,158 hours, 3,051 cycles
- Engine: Allsn AE3007C
- System (JASC): [2720 · Rudder Control System](https://openairdocs.org/jasc/2720)
- Part: Yaw Damper
- Condition: Malfunctioned
- Stage of operation: TO
- How discovered: O
- Nature of condition: J, F
- Precautionary procedure: C
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/DXTA200702151

## Discrepancy

EICAS MESSAGES, YAW DAMPER OFF LOWER,  YAW DAMPER NOT CENTERED.  (MACH TRIM OFF) ILLUMINATED DURING THE TAKEOFF ROLL AFTER 40 KTS.  [SUP 05-03-07]  PERFORMED PITOT/STATIC LEAK CHECK AND FOUND NR 2 MADC PITOT FLEX LINE LEAKING. REPAIRED LINE IN ACCORDANCE WITH FAR 91.411 PART 43 APPENDICES E AND F AND CITATION 750 MM CH 34-11-08. PERFORMED LEAK CHECK AND FOUND TO BE OK. EICAS MESSAGES NO LONGER DISPLAYED AT 40 KTS.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
