# SDR DXTA2021071245120

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 11, 2021
- Submitted: July 13, 2021
- Operation: Air carrier
- Aircraft: N377QS
- Make and model: Cessna 680CE
- Aircraft serial: 6800187
- Aircraft time: 12,214 hours, 8,096 cycles
- System (JASC): [2710 · Aileron Control System](https://openairdocs.org/jasc/2710)
- Part: Switch
- Condition: Dirty
- Stage of operation: CR
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/DXTA2021071245120

## Discrepancy

PITCH/ROLL DISCONNECT AMBER CAS: DURING LEVEL FLIGHT, PITCH/ROLE DISCONNECT MESSAGE ILLUMINATED. THE ASSOCIATED LEVER WAS NEVER OUT OF NORMAL.  TROUBLESHOT SYSTEM WITH IMT/CMC ON T/R PAGE. OPERATED T/R'S NORMAL AND EMER MODE MANY TIMES WITH NO ISSUES. INSPECTED L&R T/R WIRING AND SWITCHES. NO DAMAGE NOTED.  CYCLED T/R'S NORMAL AND EMER MODES 10 MORE TIMES. NO SWITCHES WERE LAGGING OR SHOWING SIGNS OF FAILURE. CLEANED AND LUBES T/R SWITCHES. C/W MORE OPERATIONAL CHECKS. ALL CHECKS GOOD PER CE680 AMM 78-30-00. MCC ELECTS TO RELEASE AIRCRAFT AND MONITOR WITH NO FAULT FOUND

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
