# SDR DXTA2023101197670

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: October 10, 2023
- Submitted: October 11, 2023
- Operation: Air carrier
- Aircraft: [N367QS](https://openairdocs.org/aircraft/N367QS), registered now
- Make and model: Emb EMB-505
- Registry model: [EMB EMB-505](https://openairdocs.org/model/embraer-executive-emb-505) (OpenAirDocs)
- Aircraft serial: 50500273
- Aircraft time: 6,738 hours, 5,343 cycles
- System (JASC): [3240 · Landing Gear Brake System](https://openairdocs.org/jasc/3240)
- Part: Shutoff Valve
- Part number: 22160001401
- Part serial: 961
- Condition: Faulted
- Location: Emer Brake
- Stage of operation: CR
- How discovered: C
- Nature of condition: O
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/DXTA2023101197670

## Discrepancy

DURING CRUISE AT FL410 HAD EMER BRK LO PRESS YELLOW CAS MESSAGE. ACCUMULATOR PRESSURE BLED DOWN SLOWLY FROM 1600 PSI UNTIL APROX 1100 PSI THEN DROPPED TO 100 PSI & STAYED FOR THE REMAINDER OF FLT. ACCOMPLISHED QRH & LANDED NORMAL, NO ISSUES. AFTER TOUCHDOWN, NOTICED EMER BRAKE ACCUMULATOR PRESSURE RETURNED TO 3000 PSI. PERFORMED FIM 4885 FAULT ISOLATION SUBTASK 810-013-A, OPS CHECK OF EMERG/PARKING BRAKE HYD SHUTOFF VALVE  AMM 32-43-11-710-801-A/500,  SYS FAILED OP CHECK,  REPLACED HYD SHUTOFF VALVE IAW AMM 32-43-11 , PERFORMED NORMAL & EMER/PARKING BRAKE SYS BLEED IAW  32-40-00,  MAIN HYD BLEED. COMPLETED MAIN SYS HYD BLEED, NO AIR OR DEFECTS. COMPLETED EMER/PARKING-BRAKE HYD LINE SHUTOFF VALVE OPS CHECK, NO D

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
