# SDR DXTA2025102105348

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: October 17, 2025
- Submitted: October 21, 2025
- Operation: Air carrier
- Aircraft: [N240QS](https://openairdocs.org/aircraft/N240QS), registered now
- Make and model: Cndair CL6002B16
- Aircraft serial: 6146
- Aircraft time: 4,493 hours, 2,533 cycles
- System (JASC): [2750 · Trailing Edge Flap Control System](https://openairdocs.org/jasc/2750)
- Part: Control Unit
- Part number: 60093000121
- Part serial: 431
- Condition: Faulty
- Location: Flap Sys
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/DXTA2025102105348

## Discrepancy

AFTER TAKEOFF, WE SELECTED THE FLAP HANDLE TO FLAPS 0. IMMEDIATELY AFTER THAT, WE GOT A FLAPS FAIL AMBER CAS.  FLAPS DID NOT MOVE AND REMAINED AT 20 DEGREES.  NEAR FREEZING TEMPS ON RON.   REMOVED FAULTY FLAP CONTROL UNIT. P/N: 600-93000-121, S/N: 431 INSTALLED INSPECTED/TESTED FLAP CONTROL UNLT IAW CL650 AMM TASK 27-51-04-400-801. P/N: 600-93000-121, S/N: 244. OPERATIONAL TEST OF THE FLAP CONTROL UNIT IAW CL650 AMM TASK 27-51-04-710-801. OPERATIONAL CHECK GOOD. NO FAULTS NOTED AT THIS TIME.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
