# SDR FDKA200705220

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 22, 2007
- Submitted: June 28, 2007
- Operation: Air carrier
- Aircraft: N852MJ
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 145567
- Aircraft time: 12,002 hours, 11,529 cycles
- System (JASC): [2720 · Rudder Control System](https://openairdocs.org/jasc/2720)
- Part: Relay
- Condition: Failed
- Location: Rudder
- Stage of operation: NR
- How discovered: O
- Nature of condition: O
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/FDKA200705220

## Discrepancy

FDM RON MCO.  RUDDER HARD OVER PROTECTION.  MX T/S SYSTEM WITH BREAK OUT BOX AND REPLACED RELAYS K0544, K0545, K0546, K0547, K0773, K0059, K0385.  SYSTEM FUNCTIONAL CHECK AND RUNS GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
