# SDR FOTR2102212575

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: March 15, 2011
- Submitted: March 15, 2011
- Operation: General aviation
- Filed by: [Flightstar Aircraft Services LLC, repair station FOTR986N](https://openairdocs.org/faa-repair-station/FOTR986N/flightstar-aircraft-services-llc.md) (OpenAirDocs)
- Aircraft: [N287SC](https://openairdocs.org/aircraft/N287SC), registered now
- Make and model: Boeing 727-2A1
- Registry model: [Boeing 727-2A1](https://openairdocs.org/model/boeing-727-2a1) (OpenAirDocs)
- Aircraft serial: 21345
- Aircraft time: 60,908 hours, 42,786 cycles
- System (JASC): [5752 · Aileron Tabs](https://openairdocs.org/jasc/5752)
- Part: Tab
- Condition: Debonded
- Location: Lt Wing Aileron
- Part time: 60,908 hours, 42,786 cycles
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/FOTR2102212575

## Discrepancy

LT OTBD AILERON TAB HAS DISBOND ON OTBD END.  REMOVED DAMAGE ON AILERON TAB DIM 2" X 2" IAW SRM 51-40-20, PAGE 12, PARA 7.  FABRICATED REPAIR CORE IAW SRM 51-40-20, PAGE 14, PARA 8 USING DUR-5052-44-3/16 PO 9009476 DIM 2" X 2".  BONDED CORE IAW SRM 51-40-20 PAGE 16, PARA 9.  FABRICATED REPAIR DOUBLER USING 2024T3 .012 PO 9008354 DIM 3.5" X 3.5" IAW SRM 51-40-20, PAGE 14 PARA 8. BONDED DOUBLER IAW SRM 51-40-20, PAGE 59 PARA 20.  CLEANED SEALED AND FINISHED REPAIR IAW SRM 51-40-20, PAGE 62, PARA 22.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
