# SDR HALA2022010700007

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 6, 2022
- Submitted: January 7, 2022
- Operation: Air carrier
- Aircraft: [N388HA](https://openairdocs.org/aircraft/N388HA), registered now
- Make and model: Airbus A330-243
- Registry model: [Airbus A330-243](https://openairdocs.org/model/airbus-a330-243) (OpenAirDocs)
- Aircraft serial: 1310
- Aircraft time: 39,445 hours, 6,155 cycles
- Engine: Rroyce RB211TRENT77
- System (JASC): [7100 · Powerplant System](https://openairdocs.org/jasc/7100)
- Part: Controller
- Condition: Inoperative
- Stage of operation: CL
- How discovered: O
- Nature of condition: O
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/HALA2022010700007

## Discrepancy

ATB: DURING CLIMB OUT ENG 1 BEGAN TO STALL FOLLOWED ECAM THROTTLE IDLE. UPON LANDING ECAM ALERT SHUTDOWN ENGINE //  ACCOMPLISHED TSM 75-33-00-810-807A STEPS 1 TO 4, 1(B). 431145, 1 /5/22. ACCOMPLISHED TSM 75-33-00-810-807A STEPS (2) TO 4(C). RESISTANCE OF VSV CONTROL UNIT, VSV ACTUATOR WITHIN LIMIT, CONTINUITY C/K GOOD, AND SHORT TO GND. INSULATION CHECK GOOD. 60712, 1/5/22. REMOVED AND REPLACED VSV CONTROLLER REF AMM 75-33-51. IDLE LEAK CHECK GOOD. 2133186, 01/06/22. PENDING HIGH POWER RUN./ ACCOMPLISHED TEST 5 AMM 71-00-00, OPS CHECK GOOD.  CONTROLLER OFF P/N 1875MK5 S/N SAA12-327 ON P/N 1875MK5 S/N SAA12-097

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
