# SDR HALA20240923165

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: September 21, 2024
- Submitted: September 24, 2024
- Operation: Air carrier
- Aircraft: [N395HA](https://openairdocs.org/aircraft/N395HA), registered now
- Make and model: Airbus A330-243
- Registry model: [Airbus A330-243](https://openairdocs.org/model/airbus-a330-243) (OpenAirDocs)
- Aircraft serial: 1469
- Aircraft time: 42,277 hours, 6,596 cycles
- System (JASC): [4930 · APU Engine Fuel and Control](https://openairdocs.org/jasc/4930)
- Part: Valve
- Condition: Faulted
- Location: Apu
- Stage of operation: NR
- How discovered: O
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/HALA20240923165

## Discrepancy

ETOPS - ON ECAM, APU LP VALVE FAULT FOUND. REMOVED AND REPLACED APU SHUTOFF ACTUATOR PER AMM 28-24-52-400-801-A. CONDITION SAME. REMOVED AND REPLACED RELAY 6QF PER ESPM 20-46-50-01-E ASM 28-29-01. CONDITION SAME. REMOVED AND REPLACED APU LP FUEL SHUTOFF VALVE PER AMM 28-29-42. CONDITION SAME. REPLACE 8QC PUSHBUTTON SWITCH PER TSM 28-29-810-801A TO CLEAR APU LP VALVE FAULT MESSAGE. REMOVED AND REPLACED 8QC PUSH BUTTON SWITCH IAW ESPM 20-45-22. OPS CHECKED GOOD. AMM 28-29-00-710-802-A. OKAY FOR SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
