# SDR HNAA2015032500108

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: March 25, 2015
- Submitted: March 25, 2015
- Operation: Air carrier
- Aircraft: N805EX
- Make and model: Dhav DHC8102
- Aircraft serial: 228
- Aircraft time: 58,410 hours, 66,097 cycles
- System (JASC): [3097 · Ice/Rain Protection System Wiring](https://openairdocs.org/jasc/3097)
- Part: Connector
- Condition: Damaged
- Location: Prop Heat
- Stage of operation: CR
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/HNAA2015032500108

## Discrepancy

WHEN PROP HEAT CYCLES TO NR 2 PROP A PHASE, EMERGENCY LIGHTS ILLUMINATED.  INSPECTED AND FOUND CONNECTOR PLUG 3061-J4 AND CONNECTOR PLUG 3061-P5 WITH HIGH RESISTANCE ON GROUND.  R & R BOTH CONNECTOR PLUG.  RAN ACFT AND CHECKED PROP HEAT ON BOTH SIDES. OPS CHECKED GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
