# SDR HNAA2019080800223

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 7, 2019
- Submitted: August 8, 2019
- Operation: Air carrier
- Aircraft: [N625AE](https://openairdocs.org/aircraft/N625AE), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 145115
- Aircraft time: 45,614 hours, 42,725 cycles
- System (JASC): [2150 · Cabin Cooling System](https://openairdocs.org/jasc/2150)
- Part: Valve
- Condition: Failed
- Location: Nr 1 Pack
- Stage of operation: TO
- How discovered: O
- Nature of condition: J
- Precautionary procedure: C
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/HNAA2019080800223

## Discrepancy

ABORTED TAKEOFF AT 80 KNOTS DUE TO PACK 1 OVERLOAD EICAS MESSAGE. PACK 1 SELECTED OFF.   R & R NR 1 PACK VALVE IAW AMM 21-51-01 OPS CHECK GOOD OK FOR SERVICE.    NO EMERGENCY DECLARED.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
