# SDR HNAA2020012000026

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 19, 2020
- Submitted: January 20, 2020
- Operation: Air carrier
- Aircraft: [N603KC](https://openairdocs.org/aircraft/N603KC), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 145055
- Aircraft time: 49,641 hours, 42,859 cycles
- System (JASC): [3320 · Passenger Compartment Lighting](https://openairdocs.org/jasc/3320)
- Part: Ballast
- Condition: Failed
- Location: Cabin Lights
- Stage of operation: CR
- How discovered: O
- Nature of condition: B
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/HNAA2020012000026

## Discrepancy

STRONG ELECTRICAL/BURNING SMELL COMING FROM FRONT OF A/C (VERY PROMINANT FROM FWD FA VENT). FOUND BURNT OUT LH SIDE WALL BALLEST. REMOVED AND REPLACED BURNT BALLAST IAW 33-21-03. OPS CHECK GOOD OK FOR SERVICE. INSPECTED LIGHT SOCKETS, NO DEFECTS FOUND IN SUROUNDING AREA.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
