# SDR HNAA2022122100318

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: December 18, 2022
- Submitted: December 21, 2022
- Operation: Air carrier
- Aircraft: [N625AE](https://openairdocs.org/aircraft/N625AE), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 145115
- Aircraft time: 49,808 hours, 47,357 cycles
- Engine: Allsn AE3007C
- System (JASC): [7314 · Engine Fuel Pump](https://openairdocs.org/jasc/7314)
- Part: Pump
- Condition: Faulted
- Location: Nr 2 Engine Fuel
- Stage of operation: TO
- How discovered: O
- Nature of condition: J
- Precautionary procedure: C
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/HNAA2022122100318

## Discrepancy

DURING TAKE OFF E2 LOW FUEL PRESS DISPLAYED ON EICAS WHEN OPERATING ON PUMP 2B. VERIFIED 2A AND 2C OPERATING NORMALLY... P/C C/B A4 ON LH DC DIST. BOX.  T/S IAW FIM 28-45-00-810-802-A.   R & R ELECTRIC FUEL PUMP 2B IAW AMM 28-21-01. UPON REMOVAL FOUND DEBRIS ON PUMP INTAKE SCREEN, PROBABLE CAUSE OF ISSUE. OPS CHECK IAW AMM 28-45-00 GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
