# SDR HNAA2025021200083

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: February 11, 2025
- Submitted: February 12, 2025
- Operation: Air carrier
- Aircraft: [N692AE](https://openairdocs.org/aircraft/N692AE), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 14500866
- Aircraft time: 45,309 hours, 42,033 cycles
- System (JASC): [3610 · Pneumatic Distribution System](https://openairdocs.org/jasc/3610)
- Part: Thermostat
- Condition: Faulted
- Location: Nr 2 Engine
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/HNAA2025021200083

## Discrepancy

BLEED 2 OVERTEMP MESSAGE IN FLIGHT, INDICATED IN RED ZONE  DFRL  12FEB25  06:04  CLT R/R'D BLEED #2 FAN AIR VALVE CONTROL THERMOSTAT.  STILL REQ'S OPS CHECK AND LEAK CHECK.  FACT  12FEB25  08:10  CLT OPS AND LEAK CHECK COMPLETE. GOOD IAW AMM 36-11-06.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
