# SDR HNAA2026021000115

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: February 9, 2026
- Submitted: February 10, 2026
- Operation: Air carrier
- Aircraft: [N906AE](https://openairdocs.org/aircraft/N906AE), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 14500894
- Aircraft time: 45,823 hours, 42,768 cycles
- System (JASC): [3097 · Ice/Rain Protection System Wiring](https://openairdocs.org/jasc/3097)
- Part: Wire
- Condition: Burned
- Location: Pitot Tube
- Stage of operation: TX
- How discovered: O
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/HNAA2026021000115

## Discrepancy

PITOT 3 INOP WITH BOTH ENGINES RUNNING   FACT  10FEB26  21:50  AGS   R&R WIRE FROM PIN 2 AT A3 PITOT TUBE TO PIN C3 AT RELAY K0058 USING STANDART MAINTENANCE PRACTICES. INSTALLED NEW PITOT TUBE IAW AMM 34-13-02. OPS AND LEAK CHECK GOOD. OK FOR SERVICE. 
.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
