# SDR HNAA2026110901087

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: November 8, 2026
- Submitted: November 9, 2026
- Operation: Air carrier
- Aircraft: [N650AE](https://openairdocs.org/aircraft/N650AE), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 145417
- Aircraft time: 54,698 hours, 52,680 cycles
- System (JASC): [2431 · Battery Overheat Warning System](https://openairdocs.org/jasc/2431)
- Part: Relay
- Condition: Faulted
- Stage of operation: CR
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/HNAA2026110901087

## Discrepancy

AT FL220 GEN 4 OFF BUS MSG. FOLLOWED QRH AND RESET GEN 4. MSG CAME BACK AFTER 10MINS.   T/S IAW FIM 24-60-00-810-821-A.  R & R NR 400 GCU IAW AMM 24-31-02. NO FIX. SLAVED IN NR 200 GCU IAW AMM 24-31-02. NO FIX.   R & R NR 400 MAIN GEN SHUT RELAY IAW AMM 24-31-06. INSTALLED TILL STEP 4. COMPLETE INSTALLATION REQ OPS CHECK REQ. (SEE LP388860-2 FOR COMPLETION OF NR 400 MAIN GEN SHUT INSTALLATION, OPS CHECKED GOOD

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
