# SDR HYIA20240607001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 5, 2024
- Submitted: June 7, 2024
- Operation: Air carrier
- Aircraft: [N763EA](https://openairdocs.org/aircraft/N763EA), registered now
- Make and model: Cessna 402C
- Registry model: [Cessna 402C](https://openairdocs.org/model/cessna-402c) (OpenAirDocs)
- Aircraft serial: 402C0497
- Aircraft time: 39,270 hours, 45,707 cycles
- System (JASC): [5415 · Nacelle/Pylon, Attach Fittings](https://openairdocs.org/jasc/5415)
- Part: Fitting
- Part number: 529202931
- Condition: Cracked
- Location: Lt Nacelle
- Part time: 18,498 hours
- Stage of operation: IN
- How discovered: E
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/HYIA20240607001

## Discrepancy

DURING SCHEDULED NONDESTRUCTIVE TESTING AS NOTED IN CESSNA SUPPLEMENTAL INSPECTION DOCUMENT (SID) 57-10-16, A CRACK WAS DISCOVERED ON THE LEFT HAND OUTBOARD NACELLE FITTING (OEM P/N: 5292029-31) THIS CRACK MEASURES APPROXIMATELY .104 INCHES LONG ON THE LOWER OUTBOARD LEG OF THE FITTING, AND IS CONSISTENT WITH OTHERS FOUND USING THE LIGHTED BORESCOPE INSPECTION TECHNIQUE (TEXTRON MEL54-02R2) TO SATISFY THE REQUIREMENT OF AD 2017-10-09. PREVIOUS COMPLIANCE WITH SID 57-10-16 WAS ACCOMPLISHED AT 38844.4 ACTT (425.4 FLIGHT HOURS AGO). THIS FITTING WILL BE REMOVED AND REPLACED USING NEW PARTS.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
