# SDR IPXA2014062083363

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 18, 2014
- Submitted: June 20, 2014
- Operation: Air carrier
- Aircraft: [N126UP](https://openairdocs.org/aircraft/N126UP), registered now
- Make and model: Airbus A300 F4-622R
- Registry model: [Airbus A300 F4-622R](https://openairdocs.org/model/airbus-a300-f4-622r) (OpenAirDocs)
- Aircraft serial: 0810
- System (JASC): [3411 · Pitot/Static System](https://openairdocs.org/jasc/3411)
- Part: Pitot Tube
- Part number: 0851HV
- Part serial: 296362
- Condition: Clogged
- Location: Stby Airspeed
- Stage of operation: TO
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/IPXA2014062083363

## Discrepancy

DURING TAKEOFF ROLL,  CAPTAIN`S AND F/O`S STANDBY AIRSPEED INDICATORS MALFUNCTIONED.  CAPTAIN`S AND F/O PRIMARY AIRSPEED INDICATOR OPERATED NORMALLY AT 240 KIAS CAPT AND F/O STBY AIRSPEED INDICATED 95 KNOTS.  FOUND STBY AIRSPEED PITOT TUBE PLUGGED.  R & R STBY PITOT TUBE 42DA IAW AMM 34-11-15 C/W LEAK TEST IAW AMM 34-10-00-501.  OPS AND LEAK CK NORMAL

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
