# SDR J7SA20121028001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: October 28, 2012
- Submitted: October 29, 2012
- Operation: Air carrier
- Aircraft: N521FX
- Make and model: Bombdr BD1001A10
- Aircraft serial: 20057
- Aircraft time: 7,389 hours, 4,516 cycles
- System (JASC): [3610 · Pneumatic Distribution System](https://openairdocs.org/jasc/3610)
- Part: Pressure Valve
- Part number: 60081A020000
- Part serial: 00247
- Condition: Failed
- Location: Rt Engine
- Part time: 7,389 hours, 4,516 cycles
- Stage of operation: CR
- How discovered: O
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/J7SA20121028001

## Discrepancy

RED RIGHT BLEED AIR LEAK POSTED IN FLIGHT.  REPLACED INTERMEDIATE PRESSURE VALVE AND SEALS.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
