# SDR LR7A9955

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 11, 1999
- Submitted: March 26, 2000
- Operation: Air carrier
- Aircraft: [N401LC](https://openairdocs.org/aircraft/N401LC), registered now
- Make and model: Lkheed 382G
- Aircraft serial: 4606
- System (JASC): [2150 · Cabin Cooling System](https://openairdocs.org/jasc/2150)
- Part: Gasket
- Part number: 75024416
- Condition: Failed
- Location: Bs 497
- Stage of operation: CR
- Nature of condition: M, J
- Precautionary procedure: H
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/LR7A9955

## Discrepancy

CARGO COMPARTMENT REFRIGERATION OVERHEAT LIGHT CAME ON IN FLIGHT, ANC TO FAI.  TURNED CARGO COMPARTMENT PAC OFF AND LIGHT WENT OUT.  DEFERRED CARGO COMPARTMENT AIR CONDITIONING PACK PER MEL 21-1 AND COMPLIED WITH SPECIAL PROCEDURE 1.   DMI NR 00605.  ON RETURN TO ANC CHANGED BLEED AIR GASKET FOR HEAT EXCHANGER INLET DUCT DUE FAILED.  SYSTEM OPS CHECK NORMAL PER SMP 581 21-50.  CLEARED DMI 00605.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
