# SDR NACA2025010600001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 6, 2025
- Submitted: January 14, 2025
- Operation: Air carrier
- Aircraft: [N563NC](https://openairdocs.org/aircraft/N563NC), registered now
- Make and model: Boeing 767-3BG
- Registry model: [Boeing 767-3BG](https://openairdocs.org/model/boeing-767-3bg) (OpenAirDocs)
- Aircraft serial: 30563
- Aircraft time: 85,214 hours, 21,745 cycles
- System (JASC): [2822 · Fuel Boost Pump](https://openairdocs.org/jasc/2822)
- Part: Pressure Switch
- Condition: Faulted
- Location: Zone 100
- Stage of operation: NR
- How discovered: O
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/NACA2025010600001

## Discrepancy

RIGHT CENTER FUEL PUMP DOES NOT LOAD SHED PRIOR TO ENGINE START.  REMOVED AND REPLACED R CENTER OVERPRESSURE SWITCH IAW B767-300 AMM 28-42-01 OPS TEST NORMAL.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
