# SDR NACA202504032025

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: April 3, 2025
- Submitted: April 8, 2025
- Operation: Air carrier
- Aircraft: N565NC
- Make and model: Boeing 767-300
- Registry model: [Boeing 767-300](https://openairdocs.org/model/boeing-767-300) (OpenAirDocs)
- Aircraft serial: 30565
- Aircraft time: 80,347 hours, 18,643 cycles
- System (JASC): [2897 · Fuel System Wiring](https://openairdocs.org/jasc/2897)
- Part: Relay
- Part number: 9324G10675
- Part serial: 01025
- Condition: Failed
- Location: Fuel Pump
- Stage of operation: NR
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/NACA202504032025

## Discrepancy

L AFT FUEL PUMP PRESS LIGHT ON. REMOVED AND REPLACED L AFT FUEL PUMP GFI CONTROL K10705 PER AMM 28-22-19. ALSO REPLACED L AFT FUEL PUMP AS PRECAUTIONARY. RELAY IS UNKNOWN TO TRAX.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
