# SDR NSVA2010190

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: October 20, 2010
- Submitted: October 20, 2010
- Operation: Air carrier
- Aircraft: [N199WQ](https://openairdocs.org/aircraft/N199WQ), registered now
- Make and model: Bombdr DHC8402
- Aircraft serial: 4199
- Aircraft time: 5,597 hours, 5,438 cycles
- Engine: Pwc PW150A
- System (JASC): [7397 · Engine Fuel System Wiring](https://openairdocs.org/jasc/7397)
- Part: Connector
- Condition: Dirty
- Location: Fadec
- Stage of operation: TX
- How discovered: O
- Nature of condition: J
- Precautionary procedure: D
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/NSVA2010190

## Discrepancy

RETURNED TO GATE BEFORE TAKEOFF DUE TO POWERPLANT MESSAGE.  CLEANED THE FADEC CONNECTORS ALONG WITH THE PECU CONNECTORS PER THE MANUAL.  MX PERFORMED THE RUNS, OPS CHECKED GOOD AND THE POWER PLANT MESSAGE EXTINGUISHED.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
