# SDR PCSA2011081901

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 18, 2011
- Submitted: August 26, 2011
- Operation: Air carrier
- Aircraft: N199AJ
- Make and model: Boeing 727-2F9
- Registry model: [Boeing 727-2F9](https://openairdocs.org/model/boeing-727-2f9) (OpenAirDocs)
- Aircraft serial: 21426
- Aircraft time: 66,942 hours, 46,122 cycles
- System (JASC): [3610 · Pneumatic Distribution System](https://openairdocs.org/jasc/3610)
- Part: Clamp
- Part number: BACC10DU450
- Condition: Loose
- Location: Bleed Air Sys
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/PCSA2011081901

## Discrepancy

NR 1 STRUT OVERHEAT LIGHT CAME ON AFTER TAKEOFF.  PERFORMED COMPANY PROCEDURE, LIGHT WENT OUT AND ILLUMINATED AGAIN.  RETORQUED TWO LOOSE BLEED AIR HEAT EXCHANGER CLAMPS.  PERFORMED LEAK CHECK, OK.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
