# SDR QXEA200400531

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 15, 2004
- Submitted: July 21, 2004
- Operation: Air carrier
- Aircraft: N414QX
- Make and model: Bombdr DHC8401
- Aircraft serial: 4061
- Aircraft time: 6,176 hours, 6,818 cycles
- System (JASC): [3097 · Ice/Rain Protection System Wiring](https://openairdocs.org/jasc/3097)
- Part: Wire Harness
- Part number: 697070212
- Condition: Damaged
- Location: Propeller
- Stage of operation: NR
- How discovered: O
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/QXEA200400531

## Discrepancy

PDX - FLIGHT 2317 PROP DE-ICE CAUTION LIGHT ILLUMINATED APPROXIMATELY 5 SECONDS AFTER ILLUMINATION OF NR 2 PROP DE-ICE ADVISORY LIGHT.  COMPLIED WITH PROP DE-ICE CAUTION LIGHT CHECKLIST.  PROP DE-ICE CAUTION LIGHT CONTINUED TO ILLUMINATE.  MAINTENANCE REPLACED WIRE HARNESS.  TEST OF PROP DE-ICING SYSTEM CHECKED GOOD.  AIRCRAFT RETURNED TO SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
