# SDR QXEA2010061400346

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 9, 2010
- Submitted: June 14, 2010
- Operation: Air carrier
- Aircraft: N406QX
- Make and model: Bombdr DHC8402
- Aircraft serial: 4048
- Aircraft time: 22,210 hours, 23,144 cycles
- System (JASC): [3097 · Ice/Rain Protection System Wiring](https://openairdocs.org/jasc/3097)
- Part: Wire Harness
- Part number: LA697071272
- Condition: Open
- Location: Prop De Ice
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/QXEA2010061400346

## Discrepancy

DURING CLIMBOUT IN ICING CONDITIONS PROP DEICE LIGHT ILLUMINATED AND EXTINGUISHED SEVERAL TIMES.  SEEMED TO COINCIDE WITH NR 2 PROP.  RETURNED TO FIELD AND ACCOMPLISHED A UNEVENTFUL LANDING. INSPECTED CDS FOUND CODE "OPEN PHASE C ON TMCU2". FOUND NR 2  PROP, NR 6 BLADE, DEICE WIRE HARNESS FAILED OPEN, REPLACED SAME IAW AMM 61-10-06-400-805. GRD RUN OPS CHECK GOOD. RETURNED TO SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
