# SDR QXEA2012102001324

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: October 20, 2012
- Submitted: October 25, 2012
- Operation: Air carrier
- Aircraft: N407QX
- Make and model: Bombdr DHC8402
- Aircraft serial: 4049
- Aircraft time: 27,207 hours, 28,507 cycles
- System (JASC): [5311 · Fuselage Main, Frame](https://openairdocs.org/jasc/5311)
- Part: Frame
- Condition: Corroded
- Location: Bs 156
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/QXEA2012102001324

## Discrepancy

FRAME 156, FLANGES ARE CORRODED STR 32P-30S. REMOVED NECESSARY RIVETS AND BLENDED OUT CORROSION IAW SRM 51-42-05-02-01 AND RD 8/4-53-2344. REMOVED STANCHION FOM IAW SRM 51-42-05-02-01, REMOVED CORROSION ON FWD FACE OF FRAME AT BS 156 STR 31P IAW SRM 51-21-00-00-02. MIN REMAINING THICKNESS NOTED .029" REF NTM 51-00-04-910-801 PT 1. VERIFIED AFFECTED AREA CRACK FREE REF NTM 51-00-06-910-801 PT 1. FOUND FLANGE 31S-30S OUT OF LIMITS IAW RD 8/4-53-2344. OTHER FLANGES 32P-31S AND WEB FOUND IN LIMITS IAW RD8/4-53-2344 AND RD8/4-53-4883. REMOVED FLANGE BETWEEN 31S-30S IAW RD 8/4-53-017. VERIFIED CUT EDGE CRACK FREE IAW RD 8/4-53-2344. FABRICATED NEW REPAIR FLANGE IAW RD 8/4-53-017. TREATED AND PRIMED IAW SRM 51-21-10-02-01 AND 51-25-10-02-01. INSTALLED RIVETS IN CROSS BRACE, FLANGES AND STANCHION IAW SRM 51-42-05-02-01. APPLIED PRIMER AND TOP COAT TO INTERIOR AND EXTERIOR IAW SRM 51-25-10-02-01 AND 51-25-15-02-01.  COMPLETED INSTALL OF STANCHION IAW SRM 51-42-05-02-01 AND 51-23-00-00-01. APPLIED ALUMINIZED PAINT AND CPC IAW RD 8/4-53-4883.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.