# SDR R61A20100220

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 26, 2010
- Submitted: May 27, 2010
- Operation: Air carrier
- Aircraft: N168HQ
- Make and model: Emb ERJ 190-100 LR
- Registry model: [EMB ERJ 190-100 LR](https://openairdocs.org/model/embraer-s-a-erj-190-100-lr) (OpenAirDocs)
- Aircraft serial: 19000183
- Aircraft time: 5,032 hours, 34,377 cycles
- System (JASC): [3610 · Pneumatic Distribution System](https://openairdocs.org/jasc/3610)
- Part: Shutoff Valve
- Condition: Malfunctioned
- Location: Bleed Air Sys
- Stage of operation: DE
- How discovered: O
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/R61A20100220

## Discrepancy

CREW REPORTED BLEED 2 OVERPRESSURE DURING DESCENT INTO MKE.  DECLARED EMERGENCY AND LANDED AT MKE WITHOUT INCIDENT.  MAINTENANCE REMOVED AND REPLACED E-2 NAPRSOV / HPBV / LSBV / BLEED 2 PRESSURE SENSOR PER EMB AMM.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
