# SDR R61A201212050703

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: December 5, 2012
- Submitted: December 6, 2012
- Operation: Air carrier
- Aircraft: [N113HQ](https://openairdocs.org/aircraft/N113HQ), registered now
- Make and model: Emb ERJ 170-200 LR
- Registry model: [EMB ERJ 170-200 LR](https://openairdocs.org/model/embraer-s-a-erj-170-200-lr) (OpenAirDocs)
- Aircraft serial: 17000177
- Aircraft time: 14,473 hours, 11,367 cycles
- System (JASC): [2910 · Hydraulic System, Main](https://openairdocs.org/jasc/2910)
- Part: Drain
- Condition: Leaking
- Location: Hydraulic Sys
- Part time: 14,472 hours, 11,365 cycles
- Stage of operation: CR
- How discovered: O
- Nature of condition: K, J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/R61A201212050703

## Discrepancy

CREW REPORTED HYD 2 EDP FAIL, HYD 2 SYS LOW QTY AND HYD SYSTEM WENT TO ZERO.  CREW DECLARED AN EMERGENCY AND DIVERTED TO CMH.  MAINTENANCE T/S PER EMB AMM AND FOUND THE CASE DRAIN LINE LEAKING CAUSING THE EDP TO RUN DRY.  MAINTENANCE REMOVED AND REPLACED EDP AND CASE DRAIN LINE PER EMB AMM AND OPS CHECKED GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
