# SDR R61A2013052704970

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 27, 2013
- Submitted: May 28, 2013
- Operation: Air carrier
- Aircraft: N508LX
- Make and model: Bombdr DHC8402
- Aircraft serial: 4182
- Aircraft time: 7,553 hours, 7,423 cycles
- System (JASC): [2560 · Emergency Equipment](https://openairdocs.org/jasc/2560)
- Part: Psu
- Condition: Unsecure
- Location: Row 16ab
- Stage of operation: NR
- How discovered: V
- Nature of condition: O
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/R61A2013052704970

## Discrepancy

CREW REPORTED THAT THE PSU AT ROW 16 AB FELL DOWN.  MX SECURED PSU IAW AMM AND OPS CHECKED GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
