# SDR R61A201503030151

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: March 3, 2015
- Submitted: March 10, 2015
- Operation: Air carrier
- Aircraft: [N101HQ](https://openairdocs.org/aircraft/N101HQ), registered now
- Make and model: Emb ERJ 170-200 LR
- Registry model: [EMB ERJ 170-200 LR](https://openairdocs.org/model/embraer-s-a-erj-170-200-lr) (OpenAirDocs)
- Aircraft serial: 17000156
- Aircraft time: 21,660 hours, 16,758 cycles
- System (JASC): [5397 · Fuselage Main, Bulkhead Fuselage wiring](https://openairdocs.org/jasc/5397)
- Part: Bonding Strap
- Condition: Corroded
- Location: Zone 100
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/R61A201503030151

## Discrepancy

DURING HEAVY CHECK , AFT DRAIN FAIRING 4TH POSITION 1 BONDING STRAP CORRODED. MAINTENANCE REPAIRED AFT DRAIN FAIRING 4TH POSITION 1 BONDING STRAP IAW SRM 51-73-00 RESTORED DRAIN FAIRING TO ORIGINAL FINISH IAW SRM 51-23-07. ACFT REMAINS UNTIL HEAVY CHECK IS COMPLETED.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
