# SDR R61A201506160402

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 16, 2015
- Submitted: July 7, 2015
- Operation: Air carrier
- Aircraft: N809MD
- Make and model: Emb ERJ 170-100SU
- Registry model: [EMB ERJ 170-100SU](https://openairdocs.org/model/embraer-erj-170-100su) (OpenAirDocs)
- Aircraft serial: 17000022
- Aircraft time: 28,159 hours, 21,089 cycles
- System (JASC): [5347 · Fuselage, Seat/Cargo Attach Fittings](https://openairdocs.org/jasc/5347)
- Part: Seat Track
- Condition: Corroded
- Location: Not Reported
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/R61A201506160402

## Discrepancy

DURING HEAVY CHECK RT SEAT TRACK ON PREVIOUS REPAIR IS CORRODED.  MX REMOVED DOUBLER, REMOVED CORROSION FROM RT SEAT TRACK ON PREVIOUS REPAIR STILL NO GOOD, R & R IAW  57-40-02.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
