# SDR R61A201509070632

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: September 7, 2015
- Submitted: September 15, 2015
- Operation: Air carrier
- Aircraft: [N115HQ](https://openairdocs.org/aircraft/N115HQ), registered now
- Make and model: Emb ERJ 170-200 LR
- Registry model: [EMB ERJ 170-200 LR](https://openairdocs.org/model/embraer-s-a-erj-170-200-lr) (OpenAirDocs)
- Aircraft serial: 17000182
- Aircraft time: 21,319 hours, 16,737 cycles
- System (JASC): [5312 · Fuselage Main, Bulkhead](https://openairdocs.org/jasc/5312)
- Part: Bushing
- Condition: Cracked
- Location: Bulkhead
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/R61A201509070632

## Discrepancy

DURING HEAVY CHECK, WING STUB FITTING AT CENTER OF FUSELAGE LL PRESSURE BULKHEAD TO SPAR LLL AROUND FASTENER HOLE RT SIDE.  MAINTENANCE REAMED RT SPAR WING STUB FASTENER BORE TO .375 REMOVED ALL DAMAGE IAW SRM 51-41-02.  FABRICATED AND DRILLED UP NEW BUSHING FOR REPAIR, REFER TO CONTINUATION CARD VP-031239-2015/564 C1-C2.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
