# SDR R61A201606070386

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 7, 2016
- Submitted: June 10, 2016
- Operation: Air carrier
- Aircraft: [N419YX](https://openairdocs.org/aircraft/N419YX), registered now
- Make and model: Emb ERJ 170-200 LR
- Registry model: [EMB ERJ 170-200 LR](https://openairdocs.org/model/embraer-s-a-erj-170-200-lr) (OpenAirDocs)
- Aircraft serial: 17000384
- Aircraft time: 6,344 hours, 4,437 cycles
- System (JASC): [3610 · Pneumatic Distribution System](https://openairdocs.org/jasc/3610)
- Part: Valve
- Part number: 10012463
- Part serial: 2006030977
- Condition: Faulted
- Location: Bleed Sys 1
- Part time: 20,358 hours, 12,835 cycles
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/R61A201606070386

## Discrepancy

THE CREW REPORTED THAT THEY RECEIVED BLEED 1 AND BLEED 2 OVERPRESSURE MESSAGES AFTER TAKEOFF. THE CREW DECLARED AN EMERGENCY AND RETURNED TO THE FIELD.  AFTER LANDING, A BLEED 1 FAIL MESSAGE WAS ALSO REPORTED. MAINTENANCE REPLACED THE ENGINE 1 NAPRSOV.  OPS CHECKS WERE GOOD WITH NO FURTHER DEFECTS NOTED.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
