# SDR R61A201801170055

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 17, 2018
- Submitted: January 19, 2018
- Operation: Air carrier
- Aircraft: [N412YX](https://openairdocs.org/aircraft/N412YX), registered now
- Make and model: Emb ERJ 170-200 LR
- Registry model: [EMB ERJ 170-200 LR](https://openairdocs.org/model/embraer-s-a-erj-170-200-lr) (OpenAirDocs)
- Aircraft serial: 17000375
- Aircraft time: 11,312 hours, 7,725 cycles
- System (JASC): [2910 · Hydraulic System, Main](https://openairdocs.org/jasc/2910)
- Part: Quick Disconnect
- Condition: Cracked
- Location: Hyd Line
- Part time: 11,312 hours, 7,725 cycles
- Stage of operation: CR
- How discovered: O
- Nature of condition: K, J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/R61A201801170055

## Discrepancy

NR 1 EDP FAILED AND HYD 1 LOW QUANTITY MESSAGES WITH QUANTITY READING 0. DECLARED EMERGENCY, LANDED WITHOUT INCIDENT. SERVICED THE NR 1 HYDRAULIC SYSTEM IAW AMM 12-12-01. PERFORMED INSPECTION OF THE NR 1 ENGINE AND FOUND HYDRAULIC PRESSURE LINE QUICK DISCONNECT NIPPLE CRACKED. R & R THE HYD PRESSURE LINE QD NIPPLE IAW AMM 29-11-31. OPS CHECK NORMAL. R&R NR 1 HYD PRESSURE RETURN AND CASE DRAIN FILTER ELEMENTS IAW AMM 29-11-05. OPS CHECK NORMAL. NO LEAKS. PERFORMED NR 1 EDP RUNS, DRY INSPECTION IAW AMM 05-50-23. R & R THE NR 1 EDP IAW AMM 29-11-01, OPS CHECK NORMAL.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
