# SDR R61A201811181160

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: November 18, 2018
- Submitted: November 18, 2018
- Operation: Air carrier
- Aircraft: [N875RW](https://openairdocs.org/aircraft/N875RW), registered now
- Make and model: Emb ERJ 170-100 LR
- Registry model: [EMB ERJ 170-100 LR](https://openairdocs.org/model/embraer-erj-170-100-lr) (OpenAirDocs)
- Aircraft serial: 17000180
- Aircraft time: 27,027 hours, 20,185 cycles
- System (JASC): [5347 · Fuselage, Seat/Cargo Attach Fittings](https://openairdocs.org/jasc/5347)
- Part: Seat Track
- Part number: 17003263001
- Condition: Corroded
- Location: Fuselage
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/R61A201811181160

## Discrepancy

WHILE THE ACFT IS IN HEAVY CHECK FOUND RT INBD SEAT TRACK CORRODED AS/MARKED BETWEEN FRAMES 12/20. REMOVED AND REPLACED OF RT I/B SEAT TRACK FR 12-20 REF SRM 51-40-08, TOP COATED FASTENERS PER SRM 51-23-06,APPLIED CIC TO RT INBD SEAT TRACK BETWEEN FRAMES 12/20. REF: CPM 51-25-00. ACFT REMAINS IN HEAVY CHECK UNTIL COMPLETION.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
