# SDR R61A2023041400228

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: April 12, 2023
- Submitted: April 14, 2023
- Operation: Air carrier
- Aircraft: [N217JQ](https://openairdocs.org/aircraft/N217JQ), registered now
- Make and model: Emb ERJ 170-200 LR
- Registry model: [EMB ERJ 170-200 LR](https://openairdocs.org/model/embraer-s-a-erj-170-200-lr) (OpenAirDocs)
- Aircraft serial: 17000171
- Aircraft time: 38,628 hours, 24,564 cycles
- System (JASC): [2150 · Cabin Cooling System](https://openairdocs.org/jasc/2150)
- Part: Bypass Valve
- Part number: 8209147
- Part serial: 200311159
- Condition: Fault Message
- Location: Zone 500
- Part time: 37,546 hours, 22,494 cycles
- Stage of operation: CL
- How discovered: O
- Nature of condition: O
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/R61A2023041400228

## Discrepancy

BLEED 1 LEAK.  DECLARED EMERGENCY, LANDED WITHOUT INCIDENT.  R&R PACK 1 BYPASS VALVE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
