# SDR RAIA0003010

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: March 17, 2000
- Submitted: March 20, 2000
- Operation: Air carrier
- Aircraft: N801HK
- Make and model: Emb EMB-145
- Registry model: [EMB EMB-145](https://openairdocs.org/model/embraer-emb-145) (OpenAirDocs)
- Aircraft serial: 145053
- Aircraft time: 4,412 hours, 3,438 cycles
- System (JASC): [3620 · Pneumatic Indicating System](https://openairdocs.org/jasc/3620)
- Part: Switch
- Part number: 7821008
- Condition: Failed
- Location: Rt Engine
- Part time: 4,423 hours, 3,448 cycles
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/RAIA0003010

## Discrepancy

7604-STL -DURING CLIMB, RIGHT BLEED OVERHEAT EICAS MESSAGE CAME ON.  MAINTENANCE REPLACED RIGHT ENGINE BLEED PRESSURE SWITCH.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
