# SDR RAIA2009121400003

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: December 5, 2009
- Submitted: December 14, 2009
- Operation: Air carrier
- Aircraft: N803HK
- Make and model: Emb EMB-145EP
- Registry model: [EMB EMB-145EP](https://openairdocs.org/model/embraer-emb-145ep) (OpenAirDocs)
- Aircraft serial: 145077
- Aircraft time: 26,488 hours, 24,577 cycles
- System (JASC): [8012 · Engine Start Valves/Controls](https://openairdocs.org/jasc/8012)
- Part: Start Valve
- Part number: 8166052
- Condition: Leaking
- Location: Engine
- Stage of operation: CR
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/RAIA2009121400003

## Discrepancy

CREW REPORTED RECEIVING A BLEED 2 LEAK INDICATION ON THE EICAS.  MAINTENANCE REMOVED AND REPLACED THE ENGINE GROUND START VALVE IAW AMM PROCEDURES.  OPS CHECKED GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
